FOUNDATION
• Engineered soils tests
• Under-slab radon rough-in
FRAMING
• All walls that meet or exceed 11' in height will be engineered tall walls
• 2" x 4" wood frost walls
MECHANICAL
• Waterline to fridge
• 2 non-freeze hose bibs c/w shut-off valves
• 3-piece rough-in double plumbing in basement
• Pfister™ polished chrome single-lever faucets
• Hytec one-piece bath tub
• Lennox 96% Hi-Efficiency direct vent gas furnace
• HRV (heat recovery ventilation system) c/w wall control
• Honeywell T4 programmable thermostat
• 100 Amp, 24/48 circuit panel
• 2 exterior outlets c/w When-In-Use covers and ground-fault circuit protection
• Cat5 and RG6 wiring to Great Room/Living Room, Bonus Room/Loft & Master Bedroom
INSULATION/DRYWALL
• 2lb spray foam to R28 in cantilevers
• 2lb spray foam in Mechanical Room rim joist
• Low expansion spray foam around all windows and doors
• Splatter-coat texture ceiling throughout
• 1/2" softline corners on all 90 degree wall corners
INTERIOR FINISHINGS/CERAMICS
• 3 Coats of wall paint in all developed areas
• Unfinished basement stairs are painted (1 coat)
• 3 1/2" painted MDF casings
• 4 1/2" painted MDF baseboards
• Lever handles in Satin Chrome finish throughout
• One row of white 6" x 6" tiles with white edging in all tub/shower surrounds
CABINETS/COUNTERTOPS
• Gem Cabinets (see current samples for available styles, colours and handles)
• Granite countertops in kitchen (see current samples for available colour selections)
• Tile backsplash in kitchen (see current samples for available styles and colours)
• Laminate countertops c/w laminate backsplash & rolled edges in bathrooms (as per plan)
FLOOR COVERINGS
• Laminate flooring – locations as defined on Master Plan
• Top-mount, matching wood air registers on all laminate
• Carpet in all bedrooms, stairs, hallways – exact locations as defined on Master Plan
• 7lb Black MagicÂâ„¢ cushion underlay (or higher)
• Vinyl plank tile in bathrooms
EXTERIOR
• Engineered precast step (when shown on Master Plan)
• 10' deep Steel Helix screw piles (locations and amount as shown on Master Plan)
• Rough grade completion and certificate
• Dupont Tyvek™ home-wrap to exterior of building
• 50-year architectural asphalt shingles
• 3/0 fiberglass, insulated front door
• Double-pane glass with Low Emission glazing and argon gas fill in applicable locations