Block 55 at Sawyer's Walk

Rentals Pending
Expand Map
249 Northwest 6 Street, Miami, FL
Apartment
506 Units
- Stories
Construction Started Mar 2020
Block 55 at Sawyer's Walk is a new apartment development currently under construction at 249 Northwest 6 Street, Miami. Block 55 at Sawyer's Walk has a total of 506 units.

Block 55 at Sawyer's Walk Details

Website:
-
Building Type:
Apartment
Leasing Status:
Pending
Rentals Start:
-
Construction Status:
Construction
Construction Started:
Mar 2020
Estimated Completion:
-
Builder(s):
Architect(s):
Ceilings:
-
Interior Designer(s):
-
Marketing Company:
-
Leasing Company:
-

Block 55 at Sawyer's Walk Summary

Block 55 is the latest development by Swerdlow Group, a 1 million square
foot mixed-use property. Block 55 will off er ±355,000 SF of retail space,
approximately 1,050 parking spaces and 556 apartment units.

Target will anchor the ground fl oor with a full service Starbucks and CVS
pharmacy within its space. Additional co-tenants will include a health club,
a grocer, multiple apparel concepts and hard goods. The fi rst fl oor will also
feature restaurants with outdoor seating along Sawyer’s Walk, a block-long
dedicated park on the north side of the project.

The parking garage was designed to provide customers with the most
effi cient shopping experience possible, located close to the street and low
in the structure to allow themto exit their vehicles quickly and use multiple
vertical transportation points to access the retail doors.
The residential component will feature one- and two-bedroom apartments
that are roughly 626 and 940 sf respectively. Residents will have a private
pool and clubhouse on top of the retail podium.

The project is designed by Arquitectonica, a world-renowned architecture
firm headquartered in Miami. The developer of the project is Swerdlow
Group, a major South Florida developer with over 40 years of experience.
The general contractor is expected to be John Moriarty & Associates
of Boston. John Moriarty recently completed the Brickell City Centre,
a large urban mixed-use development located due south of Block 55.
Construction is anticipated to begin in March 2020. Retail construction
will take 24 months to complete, with the residential component being
completed six months later.

Source: Block 55 at Sawyer's Walk
See More
See Less

Block 55 at Sawyer's Walk Latest News



Activity

shoppers have saved this home. Save this development to receive email alerts with building updates or when inventory that meets your bedroom, pricing, or square footage criteria becomes available.


Is this your Development?

Want to make additions to this development page and unlock its analytics? Admins can edit listings live on the site (and have full access to their developments' custom analytics interfaces!)
Updated: Aug 17, 2020
BuzzBuzzHome is North America's largest repository of new construction homes. Our comprehensive database is populated by our meticulous research and analysis of public data. BuzzBuzzHome strives for accuracy and we make every effort to verify the information. However, BuzzBuzzHome Corp. is not liable for the use or misuse of the site's information. The information displayed on buzzbuzzhome.com is for reference only.